
Wind Millwright - Four Horizons Wind Project
Mortenson
Wind Project Millwright needed for Mortenson’s Four Horizons Wind Project in Seymour, TX to assemble, align, and maintain turbine components on site.
About this role
Mortenson is seeking a Wind Project Millwright for the Four Horizons Wind Project in Seymour, TX. The role involves dismantling, erecting, assembling, aligning, adjusting, and maintaining turbine components, assisting with crane assembly/teardown, and moving major components on site. A high school diploma or GED is required, with a preference for about one year of related experience. The position requires a valid driver’s license, the ability to read and interpret technical instructions, strong teamwork and communication skills, and the physical capability to perform lifting up to 50 lbs and climb ladders.
Required qualifications
- High school diploma or GED is required.
- Current driver’s license is required.
- Ability to read and interpret safety regulations, assembly/disassembly, operation and maintenance instructions, and procedure manuals.
- Detail-oriented with active listening and effective communication skills; able to work with diverse input and provide professional customer service.
- Repetitive hand, arm, leg movements are required.
- Lifting, carrying, pushing, and pulling up to 50 lbs is required.
- Ability to climb ladders (average 80 meters) is required.
Desired qualifications
- One year of related experience in millwright work or wind turbine installation is preferred.