Planificateur site H/F

MCGP

Toulon-sur-Allier, Allier, FR
ContractBachelorsSenior levelIn personRetail Luxury Goods And Jewelry51–500 employees

Planificateur/Planificatrice de production pour le site LOSANGE de Toulon sur Allier, responsable du PDP et du planning à 3–6 mois.


About this role

The Site Planner is responsible for developing, optimizing, and steering the Master Production Schedule (MPS) to ensure client commitments and industrial performance goals are met. They coordinate site activities, manage capacity-load balancing, and oversee the execution of production orders while ensuring data reliability within the ERP system.

Required qualifications

  • Candidates must hold a degree (Bac+3 to Bac+5) in Supply Chain, Logistics, or Industrial Engineering
  • A minimum of 5 to 8 years of experience in industrial production planning, scheduling, or supply chain management is required, along with proficiency in ERP tools

Desired qualifications

  • Des connaissances avancées des outils d'amélioration continue appliqués à la Supply Chain et à la planification sont appréciées.
  • Expérience dans la réduction des écarts entre prévisions et réalisations et dans l’optimisation des stocks et des flux.
  • Bonne maîtrise de l’analyse de données de planification pour anticiper les risques et proposer des scénarios alternatifs.
  • Capacité à travailler en transversal avec les équipes Production, Approvisionnements et Supply Chain.

Similar jobs

Find your dream job with Sprout

Swipe right to apply. Let AI handle the rest.