
Second Shift Stacker
Clayton
Guin, Alabama, US
Full timeEntry levelIn personReal Estate5,001+ employees
Entry-level Second Shift Stacker responsible for feeding and stacking lumber, verifying cut sizes, and assisting production in a fast-paced manufacturing environment.
About this role
The Second Shift Stacker is responsible for feeding and stacking lumber into saws, verifying cut sizes, and banding finished products for transport. They must also maintain equipment and the surrounding work area while assisting other team members as needed.
Required qualifications
- Candidates must be able to stand and walk for 8 hours per day and repeatedly lift at least 50 lbs
- The role requires the ability to work in a fast-paced environment with extreme temperatures and a willingness to follow strict safety and operational procedures
Desired qualifications
- Consistency in performance and reliability in meeting production targets.
- Punctuality and the ability to consistently attend and contribute to team meetings.
- Willingness to help others and work collaboratively within the department.
- Ability to inspect work prior to delivery to other departments and strive for efficiency in tasks.
Restrictions
- Must be able to lift a minimum of 50 lbs repeatedly.
- Must be able to stand, walk, bend, and stoop for extended periods (8 hours with breaks).
- Must be able to work in an extremely fast-paced environment and in extreme temperatures.