Optimisation pluriannuelle des bulles de maintenance sur 10 ans F/H

EDF

Avoine, FR€11k–20k/yr
Temporary€11k–20k/yrMastersEntry levelIn personEnergy And Nuclear Power

Four-month EDF internship for a master's or engineering student optimizing 10-year maintenance planning at the Chinon nuclear power plant.


About this role

EDF is seeking a beginner-level master's or engineering student for a four-month in-person internship at the Chinon Nuclear Power Plant in Avoine, France. The intern will help identify maintenance planning windows suitable for regular 10-year multi-year optimization, establish an annual review process, and propose an internal organization to sustain the activities. The internship focuses on industrial project transformation and maintenance optimization in a nuclear power environment.

Required qualifications

  • The candidate must be a student pursuing a BAC+5 master's degree or attending an engineering school.
  • The internship is intended for a beginner-level candidate.
  • The candidate must be interested in project transformation management and industrial operations.
  • The candidate must be available for a four-month internship beginning in early 2027.

Desired qualifications

  • A strong interest in the industrial sector, particularly the nuclear industry, is preferred.
  • An aptitude for innovative problem-solving and proposing solutions is preferred.
  • An ability to work collaboratively in a demanding environment is preferred.

Restrictions

  • The position is located at EDF's Chinon Nuclear Power Plant in Avoine, Indre-et-Loire, France.
  • The position is open to all candidates, including people with disabilities.
  • The role is an in-person internship at an industrial nuclear site.

Similar jobs

Find your dream job with Sprout

Swipe right to apply. Let AI handle the rest.