
Material Controller (12 Month Contract)
Scatec
Free State, ZA
Full timeContractAssociatesMid levelIn personRenewable Energy And Construction501–1,000 employees
Senior Material Controller managing material receipt, storage, documentation, traceability, and vendor claims for a renewable energy construction project.
About this role
Scatec is seeking a Material Controller for a 12-month, site-based contract in Free State. The role manages the receipt, inspection, storage, preservation, documentation, traceability, and reporting of materials for renewable energy construction projects. Candidates must have a logistics or materials management diploma/certificate, at least five years of materials management experience, construction project experience, English fluency, and a valid driver's license.
Required qualifications
- A diploma or certificate in logistics or materials management is required.
- At least 5 years of experience in materials management is required.
- Experience working on construction projects is required.
- Fluency in spoken and written English is required.
- The ability to adapt to changing environments and quickly meet new challenges is required.
- Strong teamwork, self-motivation, timely performance, and problem-solving skills are required.
- Strong attention to detail is required.
- A valid driver's license is required.
Restrictions
- This is a 12-month contract position.
- The role is based at a project site in Free State.
- A valid driver's license is required.