
(BK5) Afstuderen: Optimalisatie Missing Materials Flow
Voortman Steel Machinery
Graduation intern needed to optimize the missing-materials process for industrial machinery installations.
About this role
Graduation internship focused on analyzing and optimizing Voortman Steel Machinery’s Missing Materials Flow. The intern will investigate root causes of missing, incorrect, or defective materials, analyze process data, collaborate across departments, and design a standardized improvement process with clear responsibilities and measurable performance indicators.
Required qualifications
- The candidate must be pursuing an HBO or WO degree in Technical Business Administration, Industrial Engineering and Management, BK5, or a comparable field.
Similar jobs
Afstuderen Customer Service: Optimalisatie van serviceplanning
Voortman Steel Machinery
Rijssen, NL
Afstuderen Customer Service: Optimalisatie van serviceplanning
Voortman Steel Machinery
Overijssel, NL
Stage of Afstuderen: Optimalisatie van Machine-inspecties
Voortman Steel Machinery
Overijssel, NL
Afstuderen: Optimalisatie van het retourproces en reductie van retouren
Voortman Steel Machinery
Overijssel, NL