
Technicienne / Technicien Essais Nucléaire F/H
EDF
Entry-level nuclear testing technician responsible for instrumentation measurements, diagnostics, and equipment testing at EDF’s Dampierre-en-Burly plant.
About this role
EDF is hiring a Nuclear Testing Technician in Dampierre-en-Burly, France. The role involves preparing measurement equipment, conducting performance tests and diagnostics on industrial instrumentation, monitoring equipment as part of preventive maintenance, and analyzing tests related to nuclear fuel monitoring. Candidates need a Bac+2 qualification in measurement, physical measurements, CIRA, GEII, or electrotechnics, or a Bac Pro with five years of relevant experience. The position is open to beginners and includes structured training, on-call duties, and compensation of €27,000–€35,000 plus variable and on-call pay.
Required qualifications
- A Bac+2 qualification such as BTS Métiers de la Mesure, DUT Mesures Physiques, CIRA, GEII, or Electrotechnics is required, unless the candidate has a Bac Pro and five years of relevant professional experience.
- The candidate must be able to understand and apply procedures in accordance with applicable requirements.
- The candidate must demonstrate methodical and rigorous working practices.
- The candidate must be able to work effectively as part of a team.
- The candidate must be able to participate in on-call duties and live within approximately 40 minutes of the Dampierre-en-Burly nuclear power plant.
- The candidate must be willing to work hands-on in an industrial nuclear environment.
Desired qualifications
- A Bac Pro qualification with five years of professional experience in instrumentation, electricity, electrotechnics, or automation is accepted as an alternative to a Bac+2 qualification.
- An interest in working in a technical industrial environment is preferred.
- Curiosity, pragmatism, and strong interpersonal skills are valued.
Restrictions
- The position is based in Dampierre-en-Burly, Loiret, France.
- On-call duty is required, and housing within 40 minutes of the plant is mandatory.
- The role involves working in a nuclear power plant and following strict operating procedures.