
Technical Lead BESS (m/w/d)
Cube Green Energy | Sunfarming
Technical Lead responsible for the strategy, procurement, integration, grid connection, commissioning, and operational handover of large-scale, grid-connected battery energy storage systems (BESS).
About this role
The Technical Lead will oversee the technical strategy, system design, and procurement for large-scale battery energy storage systems. They are responsible for managing interfaces, ensuring grid compliance, and supervising the construction and commissioning phases of energy projects.
Required qualifications
- Candidates must hold a degree in electrical or energy engineering and possess at least 8 years of experience with energy plants, including 3 years specifically in large-scale battery storage
- Strong expertise in grid connection rules, technical contract management, and leadership of external partners is required
Desired qualifications
- Experience as an Owner's Engineer or technical advisor to banks in lender technical advisory (LTA) work is preferred.
- Experience with frequency-regulation prequalification, including FCR and aFRR, and with energy-market interfaces is preferred.
- Knowledge of battery-storage fire protection standards such as VDE-AR-E 2510-50 and NFPA 855 is preferred.
- Experience with flexible grid-connection agreements and power limiting at the grid connection point is preferred.
- Experience integrating BESS and photovoltaic systems at a shared grid connection point is preferred.
- Knowledge of OT and cybersecurity for energy assets, including IEC 62443, is preferred.
- Experience building teams, processes, or technical standards is preferred.
- Experience conducting factory acceptance tests and quality assurance at manufacturers in Asia and Europe is preferred.
- Knowledge of analyzing operational data related to state of health and battery degradation is preferred.
Restrictions
- Applicants must have a completed degree in electrical engineering, energy engineering, or a comparable qualification.
- Applicants must have at least 8 years of experience with energy assets, including at least 3 years with grid-connected large-scale battery storage systems.
- Applicants must have held technical responsibility for at least one large-scale storage project of approximately 50 MW or more from procurement through commissioning.
- Business-fluent German and English are required.
- Travel to project sites and factory acceptance inspections is required.
Similar jobs
Technical Lead BESS (m/w/d)
SUNfarming GmbH
Erkner, Brandenburg, DE
Werkstudent Bau (m/w/d)
Cube Green Energy | Sunfarming
Erkner, Brandenburg, DE + 1 more city
Land Manager (m/w/d)
Cube Green Energy | Sunfarming
Berlin, Berlin, DE
Senior Project Manager Agri-PV mit co-located Batteriespeichern (m/w/d)
Cube Green Energy | Sunfarming
Erkner, Brandenburg, DE + 1 more city