
Sr. Electrical Commissioning Manager (Power Plant)
SpaceX
Texas, US + 1 more city
Full timeBachelorsSenior levelIn personAviation And Aerospace Component Manufacturing5,001+ employees
Leads field commissioning, startup, testing, and handoff of utility-scale gas and steam turbine power plants from mechanical completion through commercial operation.
About this role
Lead the commissioning of power plant systems including gas and steam turbines, HRSG, and balance of plant from mechanical completion to reliable operation. Manage the commissioning schedule, budget, staffing, and ensure all safety protocols like LOTO and permit-to-work are strictly followed.
Required qualifications
- Requires a bachelor's degree in Mechanical or Electrical Engineering and at least 5 years of experience in utility-scale power plant commissioning
- Candidates must be willing to work on-site, including nights and weekends, and meet specific U
- S
- export control requirements
Desired qualifications
- Ten or more years of experience commissioning utility-scale power plants, including gas turbines, in the field, is preferred.
- Experience serving as an OEM commissioning lead for companies such as GE Vernova, Siemens Energy, Mitsubishi Power, Solar Turbines, Baker Hughes, or an equivalent organization is preferred.
- Direct startup experience with H-class, F-class, or aeroderivative gas turbines, including LM2500 or LM6000-class units, is preferred.
- Experience with DCS and turbine control platforms such as Mark VIe or SPPA-T3000 is preferred.
- Experience with Mitsubishi DIASYS Netmation or Emerson Ovation DCS is preferred.
- Experience integrating HRSGs and steam turbines and conducting performance testing is preferred.
- Familiarity with ASME PTC 22 gas turbine or PTC 46 overall plant performance test codes is preferred.
Restrictions
- A U.S. citizen or national, lawful permanent resident, refugee, asylee, or individual eligible to obtain the required U.S. Department of State authorizations is required to comply with ITAR regulations.
- The role requires on-site availability during startups, including nights and weekends.
- The role requires willingness to travel between generation sites.
- The role requires working around energized equipment and live construction.
- The role requires working 10–12-hour outdoor shifts in heat and high-noise conditions during startup.