CONTRACTOR FOR CONSTRUCTION, INSTALLATION AND COMMISSIONING OF FOUR (4) FIXED-DO

iDE

Central Province, ZM
ContractUnknown levelIn personConstruction And Renewable Energy501–1,000 employees

Contractor required to deliver four fixed-dome biogas digesters, including construction, installation, commissioning, training, warranty, and follow-up support in two Zambian districts.


About this role

iDE Zambia is seeking a contractor to supply, construct, install, test, commission, and hand over four fixed-dome biogas digesters at beneficiary sites in Chibombo and Masaiti/Kafulafuta Districts. The contractor will be responsible for all materials, labor, supervision, civil and masonry works, gas and slurry systems, safety, testing, user training, warranty support, and follow-up visits. The assignment is expected to take approximately 48 working days and requires demonstrated comparable biogas construction experience, qualified technical supervision, adequate logistical capacity, and at least two client references.

Required qualifications

  • The contractor must have demonstrable experience constructing fixed-dome biogas digesters of comparable scale, supported by photographs or completion records and at least two verifiable client references.
  • The contractor must provide a competent lead biogas technician, engineer, or construction supervisor with knowledge of masonry dome construction, waterproofing, biogas pipework, safe testing, and commissioning.
  • The contractor must have adequate skilled masons, site supervision, equipment, and financial and logistical capacity to procure all materials and execute the works in both districts.
  • The contractor must be able to train users, document tests, and provide responsive after-sales support.
  • The contractor must supply and install all required materials, equipment, labor, gas systems, slurry infrastructure, testing, commissioning, training, warranty, and follow-up services.
  • The contractor must implement site-specific health, safety, environmental, and safeguarding measures, including excavation protection, PPE, gas-work safety, waste management, and prevention of child labor in hazardous construction.
  • The contractor must submit a fixed-price financial proposal in Zambian Kwacha covering the complete supply-and-install assignment.
  • The contractor must provide weekly progress reports and obtain written approval for material changes to scope, price, or schedule.

Desired qualifications

  • Experience delivering comparable biogas digester construction assignments with strong client references is preferred.
  • Experience providing documented warranties and at least three follow-up visits per digester is preferred.
  • Experience training beneficiaries and institutional personnel in biogas operation, maintenance, testing, and troubleshooting is preferred.
  • Experience working across multiple rural sites and districts in Zambia or similar environments is preferred.

Restrictions

  • The work must be performed at approved beneficiary sites in Chibombo (Kalola) and Masaiti/Kafulafuta Districts, Zambia.
  • No material substitutions or changes to approved specifications are permitted without iDE's prior written approval.
  • The contractor must comply with iDE safeguarding requirements and may not use child labor in hazardous construction.
  • The contractor must keep beneficiary, project, and technical information confidential and may not publish project photographs or information without iDE's prior written approval.
  • All changes to scope, price, or programme require prior written authorization from iDE.