Site Scheduler | Semiconductor Construction
TEICON ENGINEERING
Site Scheduler responsible for Primavera P6-based scheduling and subcontractor coordination on a major Phoenix semiconductor construction project.
About this role
TEICON ENGINEERING is seeking a highly experienced Site Scheduler for a large-scale greenfield semiconductor facility construction project in Phoenix, Arizona. The role manages integrated multidisciplinary construction schedules, coordinates subcontractors, analyzes critical paths and schedule risks, develops progress measurement systems, and supports the transition from construction through commissioning. Advanced Primavera P6 expertise and at least five years of relevant scheduling or project-controls experience are required; 10–15 years in complex industrial construction is preferred.
Required qualifications
- At least five years of relevant professional experience in construction scheduling and project controls is required.
- Proven experience managing complex construction schedules across project phases from initial civil works through mechanical completion and commissioning is required.
- Comprehensive knowledge of multidisciplinary construction activities, particularly Civil, Mechanical, Electrical and Instrumentation, is required.
- Advanced proficiency in Primavera P6 and experience developing, maintaining, and analyzing integrated construction schedules are required.
- Strong knowledge of critical path methodologies, schedule logic, construction sequencing, and complex scheduling interfaces is required.
- Experience evaluating subcontractor schedules, identifying inconsistencies, and implementing corrective measures is required.
- Practical experience developing and implementing progress measurement systems to monitor productivity, evaluate performance, and forecast project completion is required.
- The ability to independently manage complex scheduling challenges, identify risks, and develop mitigation and recovery strategies is required.
- Strong analytical, organizational, problem-solving, and communication skills are required.
- The candidate must be able to work in a dynamic construction environment with multiple stakeholders, demanding schedules, and complex technical interfaces.
Desired qualifications
- Familiarity with Advanced Work Packaging (AWP) methodologies and their application in large-scale industrial construction projects is preferred.
- Experience with complex industrial construction or large-scale greenfield projects is preferred.
Restrictions
- The position is located on site in Phoenix, Arizona.
- The assignment starts in January 2027 and is expected to last 2–3 years.
- Employment is offered as fixed-term employment or as an independent contractor under a 1099 arrangement.
Similar jobs
Site Scheduler | Semiconductor Construction
TEICON ENGINEERING
Phoenix, Arizona, US
Mechanical Site Supervisor | Rotating Equipment
TEICON ENGINEERING
Cameron, Louisiana, US
Site Administrator (m/w/d) & Vendor Coordinator
TEICON ENGINEERING
Fort Saskatchewan, Alberta, CA
Mechanical Site Supervisor | Rotating Equipment
TEICON Engineering GmbH
Cameron, LA, US