
Project Scheduler
Summit Line Construction
UT, US
BachelorsMid levelIn personUtility And Electrical Infrastructure Construction1,001–5,000 employees
Project Scheduler responsible for Primavera P6 CPM scheduling and project controls for utility construction projects.
About this role
The Project Scheduler will develop, maintain, update, and analyze Primavera P6 CPM schedules for high-voltage transmission, distribution, and substation construction and maintenance projects. The role includes baseline development, resource loading, critical path and float analysis, schedule reporting, time impact analyses, material coordination, and collaboration with project managers, field supervision, procurement teams, and other stakeholders. A bachelor's degree or equivalent experience and at least three years of project scheduling experience are required.
Required qualifications
- A bachelor's degree in Construction Management, Engineering, Project Management, or a related field, or equivalent demonstrated construction scheduling or project controls experience, is required.
- At least 3 years of experience in project scheduling is required.
- Proficiency with Primavera P6, including independently building, baselining, updating, analyzing, and reporting project schedules, is required.
- Working knowledge of critical path methodology, including predecessor and successor logic, constraints, total float, and critical path identification, is required.
- Experience establishing and maintaining schedule baselines and performing progress, variance, and float analysis is required.
- Experience preparing schedule narratives and supporting time impact analyses is required.
- Familiarity with resource loading, Work Breakdown Structure development, and contractual schedule submittal requirements is required.
- Strong analytical, communication, and collaboration skills are required, with a focus on safety and project excellence.
Desired qualifications
- Experience scheduling electrical infrastructure construction projects is preferred.
- Experience with DCMA 14-point schedule metrics is preferred.