
Finishing Technician - 2 (2nd shift 1pm - 9pm)
Accord Intermediate Holdings Inc
Alsip, IL, US
High schoolEntry levelIn personPackaging Manufacturing
Feeds, checks, and packs finished cartons on a weekday second-shift production line.
About this role
The Finishing Technician feeds flat cartons into gluing machines, removes and packs finished cartons, and performs quality checks in a folding-carton manufacturing environment. The role requires a high school diploma or equivalent, attention to detail, ability to stand throughout the shift and lift up to 40 pounds, and availability for the stated weekday second shift.
Required qualifications
- A high school diploma or equivalent is required.
- The candidate must be able to stand for the entire shift and lift up to 40 pounds.
- The candidate must be able to work the second shift, Monday through Friday, from 1 p.m. to 9 p.m.
- The candidate must be willing to learn new skills, take direction, and work as part of a team.
- The candidate must be able to work at production speeds and follow food safety, sanitation, quality, and workplace safety procedures.
- The candidate must have attention to detail and be able to read load tags, identify carton items, and spot quality issues.
Desired qualifications
- Experience in ISO 9001:2015 and SQF 10 food packaging environments is a plus.
Restrictions
- Second shift: Monday through Friday, 1 p.m. to 9 p.m.
- Must be able to stand for the entire shift.
- Must be able to lift up to 40 pounds; the description also notes lifting up to 50 pounds.
- Must be willing to work overtime as needed.
- Must wear a company uniform.