
John Proctor Is The Villain - Sound 3
ATG Entertainment Limited
London, Greater London, GB
ContractFull timeMid levelIn personTheatre And Entertainment
Prepare, operate and maintain sound equipment for a West End theatre production.
About this role
The Sound No. 3 prepares, operates and maintains equipment to implement and maintain the sound design for a West End production. The role requires professional sound experience, including West End production experience, and a high level of skill with preparation, rigging, maintenance and operation of sound equipment. The fixed-term, full-time contract runs until 24 April 2027 or the end of the production, whichever is sooner.
Required qualifications
- Candidates must have relevant hands-on professional experience in sound.
- Candidates must have experience working on a West End production.
- Candidates must be able to work under pressure and effectively within a team.
- Candidates must have good interpersonal and communication skills.
- Candidates must have strong organisational and time management qualities.
- Candidates must have a highly skilled level of preparation, rigging, maintenance and operation of sound designs and equipment.
Restrictions
- Must have the right to work in the UK.
- Must be able to commit to the full contract.
- Work is scheduled six days per week, Monday to Saturday, with eight shows per week plus maintenance and understudy calls.