
Senior Authorised Person (m/f/d) Offshore Substation
SeaRenergy Offshore Holding GmbH
FreelanceContractSenior levelIn personOffshore Wind Energy
Oversee high-voltage switching, isolations, and electrical safety for offshore substation construction and commissioning.
About this role
The Senior Authorised Person will oversee high-voltage switching, electrical isolations, work authorisations, and electrical safety during offshore substation construction and commissioning in the Polish Baltic Sea. The role requires relevant technical qualifications, SAP or comparable high-voltage authorisation experience, English communication skills, and specified Polish, GWO, offshore medical, and HUET certificates.
Required qualifications
- A relevant technical or electrical qualification, such as vocational training, a degree in electrical engineering, or a comparable qualification.
- Solid professional experience as a Senior Authorised Person (SAP) or in a comparable high-voltage electrical authorisation role.
- Strong practical knowledge of high-voltage switching procedures, electrical isolations, LOTO, earthing, Permit-to-Work systems, and electrical safety documentation.
- Good written and spoken English skills, strong communication abilities, a safety-conscious mindset, and confidence coordinating multidisciplinary teams.
- A valid Polish SEP Group 1 (G1 E and G1 D) qualification covering high-voltage electrical systems up to at least 220 kV, including relevant switching and supervision activities.
- A GWO package covering First Aid, Fire Awareness, Manual Handling, Sea Survival including Boat Transfer, and Working at Heights.
- A valid offshore medical from NOGEPA, AWMF, or UK OGUK.
- OPITO HUET certification.
Desired qualifications
- Experience on offshore substations, offshore wind farms, or high-voltage infrastructure projects is preferred.
Restrictions
- Offshore assignment in the Polish Baltic Sea
- 14/14 rotation