
Manager Interregional Planning
Midcontinent Independent System Operator (MISO)
Eagan, MN, US$166k–191k/yr
$166k–191k/yrBachelorsSenior levelIn personElectricity And Energy1,001–5,000 employees
Leads interregional transmission planning studies and develops a team supporting grid reliability and resilience.
About this role
Leads a team conducting interregional transmission planning studies and collaborates with transmission owners, neighboring grid operators, regulators, and other stakeholders. The role requires a relevant bachelor's degree, at least five years of technical experience, and strong analytical and communication skills.
Required qualifications
- A bachelor's degree in Engineering, Economics, Business, or a related field is required.
- At least 5 years of relevant technical experience in engineering, transmission planning, or a related discipline is required.
- Strong analytical, problem-solving, and decision-making skills are required.
- The ability to communicate complex technical concepts and build productive relationships with diverse stakeholders is required.
Desired qualifications
- Previous leadership experience is preferred.
- A master's degree in a related field is preferred.
- Experience in the electric utility or broader energy industry is preferred.
- A background in power systems engineering, transmission planning, engineering economics, or regulatory compliance is preferred.
- Experience working with regional transmission organizations, transmission owners, or regulatory stakeholders is preferred.
Restrictions
- Position is based in Carmel, Indiana; Eagan, Minnesota; or Little Rock, Arkansas.