
E3 Overhead Transmission Linesworker
Renewables Technical Services
Build overhead transmission lines across NSW, with at least two years of linework experience required.
About this role
The role undertakes overhead transmission line construction, including conductor stringing and clipping, hardware installation, tensioning, and dead-ending. It requires at least two years of overhead transmission linework experience, relevant safety and work licences, PSSR training, and current or previous network authorisation.
Required qualifications
- At least 2 years of referenceable overhead transmission linework experience.
- A White Card.
- A High Risk Work Licence.
- PSSR training.
- Current or previous network authorisation.
Desired qualifications
- Experience on 330kV projects is preferred.
- Relevant training certificates in dogging, EWP operation, tower rescue, first aid, or 4x4 are preferred.
Restrictions
- Full-time roster work.
- Projects are across New South Wales; DIDO/FIFO options are available from capital cities.
Similar jobs
E5 Overhead Transmission Linesworker
Renewables Technical Services
Pinjar WA, WA, AU
Overhead Distribution Foreman (Transmission Underbuild)
Quanta Services
Midland, Texas, US
Transmission Technician
Iberdrola Renewables
Scotland, GB
Overhead Transmission Linesperson
UGL Limited
Wagga Wagga, New South Wales, AU