E3 Overhead Transmission Linesworker

Renewables Technical Services

Western Australia, WA, AU
Mid levelIn personRenewable Energy And High-voltage Transmission11–50 employees

Build overhead transmission lines across NSW, with at least two years of linework experience required.


About this role

The role undertakes overhead transmission line construction, including conductor stringing and clipping, hardware installation, tensioning, and dead-ending. It requires at least two years of overhead transmission linework experience, relevant safety and work licences, PSSR training, and current or previous network authorisation.

Required qualifications

  • At least 2 years of referenceable overhead transmission linework experience.
  • A White Card.
  • A High Risk Work Licence.
  • PSSR training.
  • Current or previous network authorisation.

Desired qualifications

  • Experience on 330kV projects is preferred.
  • Relevant training certificates in dogging, EWP operation, tower rescue, first aid, or 4x4 are preferred.

Restrictions

  • Full-time roster work.
  • Projects are across New South Wales; DIDO/FIFO options are available from capital cities.

Similar jobs

Find your dream job with Sprout

Swipe right to apply. Let AI handle the rest.