
Project Manager, Large Load & Interconnection Programs
AECOM
Chicago, Illinois, US$125k–165k/yr
Full time$125k–165k/yrBachelorsSenior levelIn personInfrastructure Consulting And Energy
Leads client projects and technical due diligence for large-load power and grid interconnection programs.
About this role
AECOM seeks a project manager to lead client advisory, technical due diligence, business development, and project execution for large-load and interconnection programs. The role requires at least 6 years of project management experience, relevant power or energy infrastructure experience, and experience supporting large-load or related projects; travel is required as needed.
Required qualifications
- A BA/BS in Electrical Engineering, Power Engineering, Energy Systems, or a related field plus 6 years of related experience is required, or demonstrated equivalency of experience and/or education.
- Experience supporting utility, data center, renewable energy, generation, transmission, or large-load projects is required.
- Experience managing technical projects and interacting directly with clients is required.
- Experience supporting data center, AI infrastructure, semiconductor, or advanced manufacturing projects is required.
- At least 6 years of project management experience is required.
- Experience in transmission planning, interconnection services, utility planning, power system consulting, or energy infrastructure development is required.
Desired qualifications
- A master's degree in Electrical Engineering, Power Engineering, Energy Systems, or a related field is preferred.
- A Professional Engineer (PE) license is preferred.
- At least 10 years of progressive experience in transmission planning, interconnection services, or power system consulting, with a track record of winning and leading client work, is preferred.
- Previous management of power systems, utility infrastructure, and transmission planning principles is preferred.
- Knowledge of PJM, ERCOT, MISO, SPP, CAISO, NYISO, ISO-NE, and regulated utility environments is preferred.
- Experience and proven success in client relationships and business development are preferred.
- Experience leading technical due diligence or siting investigations tied to power availability is preferred.
- Experience with utility service studies, load interconnections, generator interconnections, and transmission planning studies is preferred.
- Familiarity with NERC, FERC, ISO, and RTO requirements is preferred.
- Experience using PSS®E, PSLF, PowerWorld, PSCAD, ETAP, EMTP/ATP, Promod, or similar tools is preferred.
- Prior experience building or growing a technical team or practice area is preferred.
Restrictions
- Travel as needed is required.
- US employment visa sponsorship is not available now or in the future.
- New hires must attend an in-person Day 1 onboarding at an AECOM office location.