
Master Production Scheduler
Custom Control Sensors
Phoenix, Arizona, US
Full timeSenior levelIn personManufacturing
Leads production planning across sites, balancing demand, materials, and capacity while guiding the planning team.
About this role
The Master Production Scheduler leads the creation and upkeep of annual, rolling 13-week, and four-week production plans across sites, balancing demand with materials, labor, and equipment capacity. The role also leads production planners, manages ERP/MRP planning controls, identifies constraints, supports S&OP decisions, and validates feasible customer promise dates.
Required qualifications
- Demonstrated success with master production scheduling, demand/supply balancing, and capacity plans in complex discrete manufacturing.
- Hands-on ERP/MRP experience and a strong command of routings, bills of materials, inventory, lead times, and work-center loading.
- Experience designing annual production plans, rolling master schedules, and four-week detailed planning standards.
- Ability to lead planners and work effectively with Sales, Supply Chain, Plant Managers, Engineering, and Finance.
- Ability to meet applicable export-control access requirements.
Desired qualifications
- Experience with Infor SyteLine is preferred.
- ASCM/APICS CPIM or CSCP certification is strongly preferred.
- Lean or Six Sigma experience and structured S&OP experience are valued.
- A bachelor’s degree in Supply Chain, Operations, Industrial Engineering, or a related field is preferred; equivalent substantial experience may be considered.
Restrictions
- Must be able to meet applicable export-control access requirements.
- Work includes office and manufacturing environments, walking production areas, standing, sitting, and computer work.