
Manufacturing Pre-Weigher | 2nd Shift, M/F, 2 - 10:10 pm ($22.00 + $1.00 Shift Differential)
L'Oréal
Pre-weighs chemicals and handles materials for manufacturing on the second shift.
About this role
The Manufacturing Pre-Weigher operates scales, pumps, mixing equipment, and material-handling equipment to pre-weigh chemicals and prepare warehouse requests. The role follows safety, quality, and GMP procedures, with a second-shift schedule; prior experience and education are listed as preferred rather than required.
Desired qualifications
- A high school diploma or GED is preferred.
- Forklift operation experience is preferred.
- Electrical and mechanical knowledge is preferred.
- Chemical mixing experience in a similar industry is preferred.
- Computer knowledge is preferred.
Restrictions
- Must be authorized to work in the United States on a full-time, permanent, ongoing basis.
- No immigration support or sponsorship is offered.
- Second-shift schedule: 2:00 p.m. to 10:10 p.m.
Similar jobs
Material Handler 2nd Shift (2:00PM - 10:10PM)
L'Oréal
Somerset, New Jersey, US
Material Handler - 2nd Shift ($22.50 including Shift Differential)
L'Oréal
Florence, Kentucky, US
Mechanic - Packaging Equipment - 2nd Shift (2:45PM-10:55PM)
L'Oréal
Somerset, New Jersey, US
Manufacturing Driver - 2nd Shift ($25.74/hr. + $1.00 shift differential)
Atkore
Harvey, Illinois, US