
WASHINGTON DC: Pipe Layer, Wet Utilities - Bernard Elementary School- Ward 4
Frey & Muller
Installs wet utility pipe and precast structures on a Washington, DC construction site.
About this role
The Pipe Layer installs stormwater, sewer, and water lines and sets precast structures on a construction project in Washington, DC. The role requires 2–3 years of wet utility pipe-laying experience, familiarity with trench safety, the ability to read construction drawings, a driver’s license, reliable transportation, and passing a federal background check.
Required qualifications
- The candidate must have 2–3 years of experience laying pipe for wet utility systems.
- The candidate must be familiar with trench safety and shoring practices.
- The candidate must be able to read and interpret construction drawings.
- The candidate must have a valid driver’s license and reliable transportation to job sites.
- The candidate must be able to pass a federal background check.
Restrictions
- Must have a valid driver’s license and reliable transportation to job sites.
- Must pass a federal background check.
- Must be able to perform manual labor in various weather conditions.
- Must be able to lift up to 50 pounds and stand, walk, climb, kneel, and crouch.
Similar jobs
WASHINGTON DC: Laborer, Wet Utilities - Bernard Elementary School- Ward 4
Frey & Muller
Washington, District of Columbia, US
WASHINGTON DC: Foreman, Wet Utilities - Bernard Elementary School- Ward 4
Frey & Muller
Washington, District of Columbia, US
WASHINGTON DC: Heavy Equipment Operator, Wet Utilities - Bernard Elementary School- Ward 4
Frey & Muller
Frey & Muller, DC, US
WASHINGTON DC: Pipe Layer, Wet Utilities - Edgewood Commons V, Washington DC
Frey & Muller
Washington, DC, US