
WASHINGTON DC: Pipe Layer, Wet Utilities - Edgewood Commons V, Washington DC
Frey & Muller
Installs wet utility pipes and precast structures on construction sites in Washington, DC.
About this role
The Pipe Layer installs stormwater, sanitary sewer, and domestic water lines, sets precast structures, and supports trenching, grading, bedding, and backfill work. The role requires 2–3 years of wet utility pipe-laying experience, familiarity with trench safety, the ability to interpret construction drawings, and the physical capacity for demanding outdoor work.
Required qualifications
- The candidate must have 2–3 years of experience laying pipe for wet utility systems.
- The candidate must be familiar with trench safety and shoring practices.
- The candidate must be able to read and interpret construction drawings.
- The candidate must have a strong work ethic and attention to detail.
- The candidate must have a valid driver's license and reliable transportation to job sites.
Restrictions
- Must pass a federal background check.
- Must be able to perform manual labor in varied weather conditions.
- Must be able to lift up to 50 pounds and stand, walk, climb, kneel, and crouch.
- Must have the visual acuity needed to read plans and work safely around heavy equipment.
Similar jobs
WASHINGTON DC: Foreman, Wet Utilities - Edgewood Commons V, Washington DC
Frey & Muller
Manassas, VA, US
WASHINGTON DC: Foreman, Wet Utilities - Edgewood Commons V, Washington DC
Frey & Muller
Washington, District of Columbia, US
WASHINGTON DC: Heavy Equipment Operator, Wet Utilities - Edgewood Commons V, Washington DC
Frey & Muller
Washington, DC, US
WASHINGTON DC: Pipe Layer, Wet Utilities - Bernard Elementary School- Ward 4
Frey & Muller
Frey & Muller, DC, US